Match and Final Drilling the Forward Fuselage Side Skins

Hours: 3
Manual Ref: Page 29-13 steps 1, 2 and 1/2 of step #3
Partner: N/A

I’m slowly getting back into building on the project. Most of the weekend was spent going over safety procedures with the local police and fire departments, but I was able to spend a few hours getting back into the building process. The hardest part has been trying to figure out where I left off. A testament to keeping a build log!