Hours: 3.0 Manual Ref: Page 22-5 steps 2 & 3 Partner: n/a
Just the other day I was commenting on how the plans went into great detail on some items… well when it comes to match drilling, they have some things not even mentioned. There are 2 or 3 holes on each of the leading edge ribs of the flaps that obviously need to be match drilled, but there is no mention of them (that I can find). Not a big deal, just a bit odd. The plans must have been written over time and by different people. Match and final drilling is certainly time consuming, and I still have a lot more to. Then it comes time for deburring and priming.