Hours: 3 Manual Ref: Page 18-2 steps 1 through 6 Partner: N/A
Now that the left tank is ready for disassembly, final debarring, and priming, it is time to get the right tank to the same point. Everything goes a bit quicker the second time around, but the ribs are still pretty difficult due to their tight fit.