n42bm.com

Backfilling steps

Hours: 3.5 Manual Ref: Page 8-7, Steps 1 & 3; Page 8-8, Steps 1 through 8 Partner: N/A

I spent a few hours taking apart the “test fit” I had done the day before and completed the deburring work on the HS-1004 and HS-905 ribs. Then it was a simple matter of following the steps on page 8-8. Mostly it was a lot of final drilling with the #30 drill bit and cleco’ing all the parts together. I thought I had enough cleco’s until I made my wings kit purchase, I was wrong. Apparently the horizontal stabilizer uses a LOT of 3/32 clecos. Needless to say, I have an order in for another 100 (along with a 3/32 cupped set for my squeezer :-) )