Hours: 9 Manual Ref: Page 8-5, Steps 1 through 8; Page 8-6, Steps 3 & 4; Page 8-7, Steps 1, 2, and 5 Partner: N/A
With the spar deburred, it was time to move on to match drilling the spar caps and doubler. There are a lot of holes to work with. As you can see in the “Manual Ref” header, I skipped a step or two, especially the steps that say “prime if desired”. I plan on coming back to those. Oh yea, and here in Atlanta, we got a little snow ;-)