n42bm.com

Vertical Stabilizer Test Fit #1

Hours: 3.5
Manual Ref: Page 6-2, Steps 4, 5, and 6
Partner: N/A
Notes: 6:30-8 & 9-9:45 PM steps 4, 5, 6, page 6-2

It didn’t take long to get the holes final drilled and get all the pieces cleco’ed together. I haven’t yet deburred all the parts, but wanted to see what Tim Olson had said about the ribs needing a little bit shaved off or they will cause a bend in the skin (see last picture below).  Now to take it all apart and start on step #7, deburring all those parts! For a time-lapse video of the assembly process, see vertical stabilizer assembly