n42bm.com

Vertical Stabilizer – Step 3

Hours: 4.0
Manual Ref: Page 6-2, Step 2 & 3
Partner: N/A
Notes: 12/6/2010 5-7 step 3, page 6-2

Lots of holes to be drilled then cleco’ed then deburred!  So far, no issues.  I’m probably taking more time than is absolutely necessary, but I want to keep things at “no issues”.